Humanities Arts Cultural Stu 0299 - FPV Independent Projects

Spring
2014
1
4.00
Jacqueline Hayden
01:00PM-05:00PM M
Hampshire College
313740
Jerome Liebling Center 120
jhPF@hampshire.edu
This course will provide an opportunity for Division II students in film/video, photography and related media that wish to pursue their own work, creating at least one completed new project for inclusion in the Division II portfolio. Each student will be required to present his/her work to the group several times during the semester. The members of the workshop will provide critical, technical and crew support for one another. Team projects are supported as long as each participant has a distinct and responsible role in the making of that work. Technical workshops will be offered where necessary. However, prior to joining the workshop, students must have some level of mastery over his/her medium as well as course evaluations in prerequisite areas. We will unpack the conceptual process of creating and realizing new works. Readings, screenings and museum/gallery visits, which address the specific problems faced by class members in developing the works-in-progress, will contribute to the overall experience of the workshop. All of these activities including active verbal contributions to all sessions are required of each student under the guiding principle that tracking each other's intellectual and creative process will help each person develop their respective project.This course provides a structured context in which to do independent work at the Division II-level. Prerequisites: evaluations from at least two courses in a related discipline.Instructor Permission Required
Independent Work A lab fee of $50 covers the use of Hampshire's equipment plus film/video rentals. NOTE: Enrolled or top 5 waitlist students who DO NOT attend the first class session risk losing their place on the class roster. In this course, students are expected to spend 8 hours a week of preparation and work outside of class time. This may include screenings or labs.
Permission is required for interchange registration during all registration periods.