Civil & Environmental Engrg 523 - Ground Imprvmnt & GeoConstrctn

Fall
2013
01
3.00
Alan Lutenegger

TU TH 1:00PM 2:15PM

UMass Amherst
37893
Engineered ground improvement; slurry trenches, dewatering systems; grouting; deep dynamic compaction, vibro compaction; stone columns; wick and vertical sand drains. Emphasizes basic principles and design methodology. Prerequisite: CE-ENGIN 320.
Pre Req: CE-ENGIN 320
Permission is required for interchange registration during the add/drop period only.