Civil & Environmental Engrg 523 - Ground Imprvmnt & GeoConstrctn
Fall
2016
01
3.00
Alan Lutenegger
TU TH 1:00PM 2:15PM
UMass Amherst
76313
Engineered ground improvement; slurry trenches, dewatering systems; grouting; deep dynamic compaction, vibro compaction; stone columns; wick and vertical sand drains. Emphasizes basic principles and design methodology. Prerequisite: CE-ENGIN 320.
Open to Seniors and Graduate students only with a GPA of 3.0 or better. Pre Req: CE-ENGIN 320