Building & Construction Tech 597U - ST-FundamntlConstruction Sched
Spring
2017
01
3.00
Chao Xiao
F 1:25PM 2:15PM
UMass Amherst
21378
This class aims to provide students fundamental knowledge for construction planning and scheduling. In the class, students learn to identify work item by using Work Breakdown Structure (WBS), study work logistic sequence, and learn to apply the Critical Path Method (CPM) to construction projects, using precedence diagram networks. To practice the planning and scheduling knowledge, students direct an entire project from planning through scheduling and control, both manually and through software.