Architecture 550 - Tectonics I
Fall
2019
01
3.00
Louis Fiocchi
M W 9:05AM 11:00AM
UMass Amherst
24047
John Olver Design Bldg Rm 162
lfiocchi@umass.edu
24429
Analysis and review of the entire light-frame construction process, from regulation and design through site preparation, project management, and ultimate delivery of a completed structure. Limited to MArch and MS Design majors.
Open to M. Design & M.Arch students only