Civil & Environmental Engrg 469 - WaterSupply&Wastewater Collctn

Spring
2019
01
3.00
John Tobiason
M W 8:40AM 9:55AM
UMass Amherst
11983
Engineering Laboratory rm 323
tobiason@ecs.umass.edu
Design of water supply and wastewater collection systems. Topics include water transmission mains, water distribution systems, pumping, storm sewers and sanitary sewer systems. Design projects, oral and written engineering reports. Ethics and professionalism.
Pre Req: CE-ENGIN 357 & 370
Permission is required for interchange registration during the add/drop period only.