Architecture 550 - Tectonics I
Spring
2024
01
3.00
Hellen Awino
TU TH 1:00PM 2:15PM
UMass Amherst
10460
John Olver Design Bldg Rm 170
hawino@umass.edu
Analysis and review of the entire light-frame construction process, from regulation and design through site preparation, project management, and ultimate delivery of a completed structure. Limited to MArch and MS Design majors.
Open to M-ARCH and MS-DESIGN students and junior and senior BS-ARCH students.